NV又中招...TSMC才是王道..

下一批Ampere 全面用TSMC 7nm.
https://www.guru3d.com/news-stor ... m-tsmc-in-2021.html

ne thing is clear, Samsung can't produce the Ampere-based GPUs quick enough or in enough volume so, from the looks of things, NVIDIA will be moving a large chunk of wafer fabrication to TSMC.

The news reached the web today though DigiTimes. And if true that means that NVIDIA likely will slip towards 7nm wafer die production, as expected for a long time in the first place. What also is possible it that the 'update' product like an RTX 3080 with 20GB or other products like the RTX 3050/3060 in the lineup that has not been released just yet move to that TSMC 7nm node.
.....

三星又伏貪平客

TOP

咁搞法
三星代工既高通875

TOP

moving a large chunk of 唔等於全部, 仲係要抽獎的

TOP

咁會唔會體質再好咗

TOP

韓國嘢都係靠吹
不過點都好過中國吹完沒嘢出到黎

TOP

樓上的人唔識雞腸?

TOP

連合同賠償,7nm AMPERE得加一倍價了。

TOP

提示: 作者被禁止或刪除 內容自動屏蔽

TOP

都係客仔中伏多啲
買完3080轉頭又出7nm+20gb vram 3080 super super super

TOP